Message boards : Graphics cards (GPUs) : Cancelled by server
Author | Message |
---|---|
is this by purpose, or what? | |
ID: 9001 | Rating: 0 | rate: / Reply Quote | |
I just had a similar problem, with a partially completed WU cancelled after 10 hours (approx 80% complete). | |
ID: 9003 | Rating: 0 | rate: / Reply Quote | |
We cancelled a set (hopefully small) of running WUs. That happened in relation to a fix reported in another thread (download error). In handling the huge amount of GPUs that you generously donate we struggle, from time to time, with the unpredictable... | |
ID: 9015 | Rating: 0 | rate: / Reply Quote | |
hmm - if things like this happen, you should at least grant some credit for the killed WUs. it's not funny to loose several hours of crunching time due to a faulty scheduler-setup.. | |
ID: 9016 | Rating: 0 | rate: / Reply Quote | |
hmm - if things like this happen, you should at least grant some credit for the killed WUs. it's not funny to loose several hours of crunching time due to a faulty scheduler-setup.. I saw this on the WU on one of my team mates. The problem is, when the WU is marked as redundant, the reported WU doesn't contain how long it has run in the log file, and she said it was already at 50%! So it isn't even possible to grant partial credits. ____________ Member of BOINC@Heidelberg and ATA! | |
ID: 9041 | Rating: 0 | rate: / Reply Quote | |
I've had that done to me also, 90% plus (about 18 hours work) done and chopped off at the knees. A big fat "GOOSE EGG" for the credit. I've started to abort work units where the initial replication is more than "1" | |
ID: 9044 | Rating: 0 | rate: / Reply Quote | |
This is not a problem of replication. Replication does not cancel the workunit if you are running it. | |
ID: 9074 | Rating: 0 | rate: / Reply Quote | |
Message boards : Graphics cards (GPUs) : Cancelled by server